About your Search

20121201
20121231
Search Results 0 to 1 of about 2
the panels down. >> commissioner sugaya. >> the project had a pre-application meeting, which is required. which included notification to the neighborhood associations for the neighborhood. >>> when did that take place? >> that could have taken place, i believe prior to the filing of the building permit application. >> so mr. nickitas, do you know what that date was? >> commissioner, that pre-dated my involvement with the project, but architect levitt sent out notices for the preapmeeting and we have the attendance from it. my understanding is that the pacific neighborhoods association received notice and choose not to attend the pre-app meeting >> thank you >> thank you. >> commissioner? >> i actually don't have a problem with this project. i don't like the way the solar panels are sitting and if we can work on that, that would be -- not too happy that we're not gaining any units, are we? but then we have to talk about making the building even taller. i don't know. >> commissioner hillis? >> i would agree. i mean, obviously you can't add a floor here in a dense neighborhood and n
solar panels and you have a nice, high interior space. >> commissioner sugaya, you are looking at interior height, 13. >> section you have floor to floor heights, as well as the floor dimensions. and it goes 8.1 8.1, 10 and then 13 feet is the way mine is dimensioned. >> 14 is from top of the finished floor. >> this is interior 12. if he is at 14.1. so you take it down to 13. that is fine with me, drop a foot off of there. it's not a foot, a foot and one inch, i guess and make your panels flat. that would be the motion to approve. >> so you take a foot -- say it again. >> well, the floor to floor now i understand looking at these plans is 14.1 for the top floor. and my motion is to drop that one foot, one inch to 13' total exterior floor to floor height and put only flat solar panels on the top. >> i second. >> commissioner borden? >> i would say, you know, what is really hard about this, this was a discretionary review, i would be whatever, to be honest, in terms it's a code-complying project, et cetera. but i have a harder time wrapping myself around the necessary
Search Results 0 to 1 of about 2

Terms of Use (10 Mar 2001)